KWANOKUTHULA MAIN OUTFALL SEWER & PUMPING MAIN UPGRADE, PLETTENBERG BAY: Draft Basic Assessment Report (BAR)
Commenting period: 7 April – 11 May 2026
HilLand Environmental, independent Environmental Assessment Practitioners (EAPs), have been appointed by Bitou Municipality, to ensure compliance with the National Environmental Management Act (NEMA, No. 107 of 1998, as amended) and Environmental Impact Assessment Regulations (2014, as amended).
The existing sewer infrastructure is aged and undersized for the current demand and need. This has resulted in frequent blockages, pipe failures and sewage overflows within the residential, open space areas and eventually to the Roodefontein Dam which is one of Plettenberg Bay’s clean water sources.
In addition, the proposed upgrades will allow for linking services for various expansion areas in Kwanokuthula (housing, education and commercial facilities).
The proposal entails the upgrading of the Kwanokuthula sewer infrastructure in Plettenberg Bay (PHASE 1 and 2). The proposal includes:
– upgrade of existing pipes and associated infrastructure (e.g. pipelines and manholes)
– installation of new connections to future development areas
– realignment of the network where it is in a midblock
– upgrades and expansion of the pump stations (pump station (PS) 1 and 3) to be able to accommodate the network upgrades and associated capacity increases
– implementation of gabion riparian stabilisation at pump station 1 to protect pump station 1’s infrastructure
The maximum diameter pipes to be installed up to 355mm, with the capacity to reach a maximum flow rate of 300 l/s.
All work will be undertaken in accordance with the engineering method statement and MMP/EMPr that incorporates mitigation measures recommended by various specialists that formed part of the assessment.
In terms of Regulations 3(4) & 40 of the NEMA EIA Regulations (2014, as amended) to notify you of the availability of the Draft Basic Assessment Report (BAR) and Maintenance Management Plan (MMP, App H) for its 30-day commenting period (7 April – 11 May 2026).
Please provide us with your comments / concerns relating to the proposal during the aforementioned timeframes in written format via email. Please note that your comments on the above matter will form part of the public record in terms of POPIA.
Please note that you need to register as an Interested and Affected Party (I&AP) in order to receive updates on the process. Please register via email – admin@hilland.co.za. Note, you need to declare your interest.
Please note if you do not have access to e-mail, internet and / or are experiencing any problems with downloading information, please do not hesitate to contact this office and we will assist you according to your needs/requirements. If you require any further information or assistance, please contact us on (044) 889 0229 (Tel) / admin@hilland.co.za (email).
Documents
01. Draft Basic Assessment Report (BAR)
See App H for EMPr/MMP
App B1 – 04. Watercourse crossing
App B1 – 05. Riverbank protection
App B2 – Environmental sensitivity
App D – Biodiversity maps _compressed
App E2 – CapeNature NOI Comment
App E6 – Dep Transport NOI Comment
App F – 01. Public Participation Report
App F – Ann A – NOI Notification
App F – Ann A – WULA Notification
App F – Ann E – HWC confirmation
App F – Ann E – NOI_WULA comments
App G – 01. Agriculture compliance statement
App G – 02. Biodiversity assessment
App G – 03. Aquatic Assessment
App H – Ann D – Environmental Induction Sheet
App H – Ann D – Induction Register
App H – Ann E – Method Statement
App H – Ann F – List of rescued plants
App H – Ann G – Protected plant species as per the act
App H – Ann I – Engineering MS
App H – Ann J – Human remains chance find
App H – Ann J – Palaeo chance find