Proposed new balancing dam at the George Water Treatment Works (WTW)

HilLand Environmental (Pty) Ltd have been appointed as the Environmental Assessment Practitioners (EAP) by the applicant, George Municipality, represented by Zutari (Pty) Ltd, to ensure compliance with regulations contained in the National Environmental Management Act (NEMA Act No. 107 of 1998), the Environmental Impact Assessment Regulations (2014), as amended, and the National Water Act (Act No. 36 of 1998) for the proposed new 40ML Raw Water Balancing Dam on Remainder of Erf 221, George Municipality Water Treatment Works (WTW), George.

The Final Basic Assessment Report (BAR) was submitted to the Department of Environmental Affairs and Development Planning (DEA&DP) for decision making on 12th December 2023.

Background on activity: Construction of an additional 40ML raw water balancing dam and associated infrastructure (pipeline, fence etc.) which will be tied in with the existing two balancing dams. The new balancing dam is required to increase the raw water storage capacity at the Water Treatment Works on RE/Erf 221, George.

Relevant listed activities:

NEMA EIA Regulation GN No. 327 – (Listing Notice 1): Activity 9 (water pipeline infrastructure); Activity 12 (development within 32m of a watercourse – overflow channel repair); Activity 13 (Development of dam); 27 (clearance of more than 1ha of indigenous vegetation); 50 (expansion of dams)

NEMA EIA Regulation GN No. 324 – (Listing Notice 3): Activity 4 (roads); Activity 12 (Clearance of 300m2 of endangered vegetation)

NWA Section 21(b) – storage of water; (c) – impeding & diverting structure & (i) – altering beds or banks of river.

 

Please note that your comments on the above matter will form part of the public record in terms of POPIA.

Please note:

Only registered I&AP’s will receive further notifications of the EIA & WULA application process.

If you require any further information or assistance, please contact us on (044) 889 0229 (Tel) 086 542 5248 (fax) or Email: environmental@hilland.co.za  / admin@hilland.co.za.

Documents

(To download images, please select the link to open, then right click and select “Save As”)

Final Basic Assessment Report:

 01 – Final BAR – 12 December 2023

Appendix A1 – Locality map

Appendix B1 – a. Preferred alternative site plan – stockpile

Appendix B1 – a. Preferred alternative site plan

Appendix B1 – b. Full set of engineering plans

Appendix B1 – Preferred alternative site plan

Appendix B2 – Environmental sensitivity map

Appendix C – Photographs of the site

Appendix D – Biodiversity overlay maps

Appendix E1 – Final comment from HWC

Appendix E3 – Acceptance of WULA report

Appendix E3 – BOCMA comments

Appendix E5 – DFFE Forestry comments

Appendix E7 – Department of Agiculture comment

Appendix F – Final BAR PPP report

Appendix F – Annexures

Appendix G – Aquatic biodiversity report

Appendix G – Terrestrial, pland and animal compliance statement

Appendix H – Environmental Management Programme (EMPr) Final BAR

Appendix H – Annexures

Appendix I – Site Sensitivity Verification Report and screening tool report

Appendix L – Alternative 1 & 2 plan

Appendix M – Engineering design report

Appendix N – Final Water Use License Application Report_signed JK

Appendix O – Engineering method statement

Appendix O – Memorandum 40 ML Balancing Dam – Stockpile

Appendix P – CV of EAPs

Draft Basic Assessment Report:

GEO23.1202.15 – Draft BAR

Appendix A1 – Locality map

Appendix B1 – a. Preferred alternative site plan

Appendix B1 – b. Full set of engineering plans

Appendix B2 – Environmental sensitivity map

Appendix C – Photographs of the site

Appendix D – Biodiversity overlay maps

Appendix E1 – Final comment from HWC

Appendix E7 – Department of Agiculture comment

Appendix F – Draft BAR PPP report

Appendix F – Annexures

Appendix G – Aquatic biodiversity report

Appendix G – Terrestrial, pland and animal compliance statement_Draft BAR

Appendix H – EMPr – Draft BAR

Appendix H – EMPr Annexures

Appendix I – Site Sensitivity Verification Report and screening tool report

Appendix L – Alternative 1 & 2 plan

Appendix M – Engineering design report

Appendix N – Final Water Use License Application Report_signed JK

Appendix O – Engineering method statement

Appendix P – CV of EAPs

Pre-Applicaiton Basic Assessment Report:

01. Pre-Aplication Basic Assessment Report (BAR)

Appendix A1 – Locality map

Appendix B1 – a. Preferred alternative site plan

Appendix B1 – b. Full set of engineering plans

Appendix B2 – Environmental sensitivity map

Appendix C – Photographs of the site

Appendix D – Biodiversity overlay maps

Appendix E1 – Final comment from HWC

Appendix E7 – Department of Agiculture comment

Appendix F – a. Public participation process (PPP) report

Appendix F – b. PPP Annexures

Appendix G – Aquatic biodiversity impact assessment

Appendix G – Terrestrial biodiversity compliance statement

Appendix H – a. Environmental Management Programme (EMPr) Pre-App BAR

Appendix H – b. EMPr Annexures

Appendix I – Site Sensitivity Verification Report and screening tool report

Appendix L – Alternative 1 & 2 plan

Appendix M – Engineering design report

Appendix N – Draft Water Use License Application Report

Appendix O – Engineering method statement

Appendix P – CV of EAPs

Final Water Use License Application Report

GEO23.1202.16_Final Water Use License Application Report_signed JK

Annexure A – Draft Basic Assessment Report and appendices (above)

Annexure B Engineering design report

Annexure C – Aquatic biodiversity report

Annexure C – Terrestrial, pland and animal compliance statement_Draft BAR

Annexure D – Preferred alternative site plan

Annexure D – Biodiversity overlay maps

Annexure D – Locality map

Annexure D – Environmental sensitivity map

Annexure E – Full set of engineering plans

Annexure F – DWS Signed George WU Licence 20141215

 

Draft Water Use License Application Report

GEO23.1202.08 – Draft Water Use License Application Report

Annexure A – Pre-Application Basic Assessment Report and appendices (above)

Annexure B – 1001910-0000-REP-JJ-00004-2 – Design Report

Annexure C – Aquatic biodiversity impact assessment

Annexure C – Terrestrial biodiversity compliance statement

Annexure D – Biodiversity overlay maps

Annexure D – Environmental sensitivity map

Annexure E – 1001910-0000-CC-0001-T0 General layout

Annexure E – 1001910-0000-CC-0002-T0 section balancing dam

Annexure E – 1001910-0000-CC-0003-T0 inlet structure details

Annexure E – 1001910-0000-CC-0004-T0 dam outlet_spillway

Annexure E – 1001910-0000-CC-0005-T0 rising main plan_lsec

Annexure E – 1001910-0000-CC-0006-T0 Outlet pipe plan_lsecs

Annexure E – 1001910-0000-CC-0007-T0 inlet pipes plan_lsecs

Annexure E – 1001910-0000-CC-0008-T0 Malgas_old pstn plan_lsecs

Annexure E – 1001910-0000-CC-0009-T0 drainage pipes plan_lsecs

Annexure E – 1001910-0000-CC-0010-T0 chamber details 1 of 3

Annexure E – 1001910-0000-CC-0011-T0 chamber details 2 of 3

Annexure E – 1001910-0000-CC-0012-T0 chamber details 3 of 3

Annexure E – 1001910-0000-CC-0013-T0 general details 1 of 2

Annexure E – 1001910-0000-CC-0014-T0 general details 2 of 2

Annexure F – DWS Signed George WU Licence 20141215