Upgrading of and Maintenance to the Boland Park storm water system
HilLand Environmental (Pty) Ltd have been appointed as the Environmental Assessment Practitioners (EAP) by the applicant, Mossel Bay Municipality, represented by SMEC South Africa, to ensure compliance with regulations contained in the National Environmental Management Act (NEMA Act No. 107 of 1998) and the Environmental Impact Assessment Regulations (2014), as amended, for the proposed upgrading of and maintenance to the Boland Park storm water system, Boland Park, Voorbaai, Mossel Bay.
Background on activity: The proposal will entail the upgrade of the existing storm water channel at Boland Park, Voorbaai, Mossel Bay. The upgrade and maintenance of the storm water channel extends from west of Erf 13169 to where it ties in with the existing storm water gabion structure further downstream.
Relevant listed activities:
NEMA EIA Regulation GN No. 327 – (Listing Notice 1): Activity 19 (infilling/excavation of more that 10m3 within a watercourse and the maintenance management plan exclusion for operational aspect);
NEMA EIA Regulation GN No. 324 – (Listing Notice 3): Activity 12 (Clearance of 300m2 of endangered vegetation)
Please note that you need to declare your interest in the above matter and that the information will form part of the public record in terms of POPIA.
Documents
(To download images, please select the link to open, then right click and select “Save As”)
Final Basic Assessment Report:
Appendix B1 – 01 Preferred Alternative – C1877-100-001 LAYOUT AND STORMWATER LONGSECTION BOLAND PARK
Appendix B1 – 01 Preferred Alternative – C1877-100-002 TYPICAL GABION CHANNEL CROSS SECTION
Appendix B1 – 01 Preferred Alternative Site Development Plan
Appendix B1 – 02 Alternative 2 – Boland Park Gabion Channel_V1
Appendix C – Photographic record
Appendix D – Biodiversity Overlay Maps
Appendix E1 – HWC Confirmation – 10 November 2022
Appendix E2 – CapeNature 9 November 2023
Appendix E3 – BOCMA – 20 October 2023
Appendix E4 – DFFE O&C – 22 September 2023
Appendix E5 – DFFE Forestry – 22 September 2023
Appendix E14 – DEADP Coastal Management – 3 November 2023
Appendix E17 – GRDM – 28 September 2023
Appendix E22 – DEADP Ackn and comment NOI – PPP
Appendix F – Annexure A – Notification of I&AP’s (merged)
Appendix F – Annexure A – Notification Map – Boland Park
Appendix F – Annexure A – Notificaiton of Neighbouring property – 18 Sept 2023
Appendix F – Annexure A – Notificaiton letter drop 15 Sept 2023
Appendix F – Annexure A – Neighbour Notificaiton (Erf 11227) – 19 Sept 2023
Appendix F – Annexure A – Letter Drop – Notification Letter
Appendix F – Annexure A – I&AP – Notification Letter
Appendix F – Annexure A – CapeNature Reminder emails
Appendix F – Annexure B – Legal notice – 15 Sept 2023
Appendix F – Annexure C – Site notice 15 Sept 2023
Appendix F – Annexure D – I&AP’S Register
Appendix F – Annexure E – HWC Confirmation – 10 November 2022
Appendix F – Annexure F – Draft BAR comments
Appendix F – Annexure F – DTPW Comments
Appendix F – Annexure F – DTPW Comments_Hatch
Appendix F – Annexure F – RE_1712 – Municipal property
Appendix G – 01 Aquatic Report Addendum
Appendix G – 01 Boland Park gabions – Aquatic Assessment
Appendix G – 01 Specialist Declaration – J Dabrowski
Appendix G – 01 Aquatic Specialist CV
Appendix G – 02 Hilland Boland Park stormwater channel – biodiversity Report
Appendix G – 02 Specialist Declaration – D Hoare
Appendix G – 02 Biodiversity specialist CV
Appendix H – EMPr and MMP – Boland Park Stormwater – FBAR
Appendix I – Boland Park -Mossel Bay Municipality-2023-08-02
Appendix I – Site Sensitivity Verification Report – Application
Appendix K – Need & Desirability Letter
Appendix L – 001 Prelim Design Report_Boland Park Final Rev01_2023-7-28
Appendix L – 01 Preferred Alternative – C1877-100-001 LAYOUT AND STORMWATER LONGSECTION BOLAND PARK
Appendix L – 01 Preferred Alternative – C1877-100-002 TYPICAL GABION CHANNEL CROSS SECTION
Appendix L – 02 Alternative 2 – Boland Park Gabion Channel_V1
Draft Basic Assessment Report:
01 – Basic Assessment Report – Boland Park
Appendix B1 – 01 Preferred Alternative – C1877-100-001 LAYOUT AND STORMWATER LONGSECTION BOLAND PARK
Appendix B1 – 01 Preferred Alternative – C1877-100-002 TYPICAL GABION CHANNEL CROSS SECTION
Appendix B1 – 01 Preferred Alternative Site Development Plan
Appendix B1 – 02 Alternative 2 – Boland Park Gabion Channel_V1
Appendix C – Photographic record
Appendix D – Biodiversity Overlay Maps
Appendix E1 – HWC Confirmation – 10 November 2022
Appendix F – 01 BAR PPP Report
Appendix F – Annexure A – I&AP – Notification Letter
Appendix F – Annexure A – Letter Drop – Notification Letter
Appendix F – Annexure A – Notificaiton letter drop 15 Sept 2023
Appendix F – Annexure A – Notificaiton of Neighbouring property – 18 Sept 2023
Appendix F – Annexure A – Notification Map – Boland Park
Appendix F – Annexure A – Notification of I&AP’s (merged)
Appendix F – Annexure B – Legal notice – 15 Sept 2023
Appendix F – Annexure C – Site notice 15 Sept 2023
Appendix F – Annexure D – I&AP’S List
Appendix F – Annexure E – HWC Confirmation – 10 November 2022
Appendix G – Aquatic Report Addendum
Appendix G – 01 Boland Park gabions – Aquatic Assessment
Appendix G – 01 Aquatic Specialist CV
Appendix G – 01 Specialist Declaration – J Dabrowski
Appendix G – 02 Hilland Boland Park stormwater channel – biodiversity Report
Appendix G – 02 Biodiversity specialist CV
Appendix G – 02 Specialist Declaration – D Hoare
Appendix H – 01 EMPr & MMP – Boland Park Storm water
Appendix I – Boland Park -Mossel Bay Municipality-2023-08-02
Appendix I – Site Sensitivity Verification Report – Application
Appendix K – Need & Desirability Letter
Appendix L – 001 Prelim Design Report_Boland Park Final Rev01_2023-7-28
Appendix L – 01 Preferred Alternative – C1877-100-001 LAYOUT AND STORMWATER LONGSECTION BOLAND PARK
Appendix L – 01 Preferred Alternative – C1877-100-002 TYPICAL GABION CHANNEL CROSS SECTION
Appendix L – 02 Alternative 2 – Boland Park Gabion Channel_V1